What the government is buying
The Federal Bureau of Prisons (BOP) at the Federal Correctional Institution (FCI) Bastrop, Texas, is seeking a contractor to install a generator. This is electrical work at a federal prison facility, which typically involves ensuring reliable backup power for critical operations. See the solicitation for specific generator capacity, installation scope, and technical requirements.
Key facts
| Field | Value |
|---|---|
| Agency | Department of Justice, Federal Bureau of Prisons, Federal Acquisition Office |
| Notice type | Combined Synopsis/Solicitation |
| Solicitation number | 15BBNF27Q50100001 |
| NAICS | 238210 |
| Set-aside | Small Business Set Aside - Total |
| Response deadline | December 2, 2026, 11:00 a.m. Pacific Time |
| Place of performance | Bastrop, Texas |
Who can bid
Only small businesses may bid on this contract. The NAICS code 238210 classifies this as "Electrical Contractors and Other Wiring Installation Contractors," with a size standard typically based on average annual receipts (see SBA.gov for current thresholds). To qualify, your business must:
- Meet the SBA size standard for NAICS 238210
- Be registered in SAM.gov with active status
- Have any required federal or state electrical licenses
- Demonstrate experience with commercial or industrial electrical installations, preferably in institutional or secure environments
How to put together a competitive bid
Verify your SAM registration now. An expired registration is the most common reason small businesses lose eligibility. Check that your NAICS 238210 is listed in your SAM profile.
Understand the work environment. Federal prison facilities have strict security protocols, background check requirements, and limited access hours. Factor in time for CAC/PIV credentialing, escorted access, and potential after-hours work restrictions. See the solicitation for specific security requirements.
Assess your electrical capabilities. Generator installation at this scale typically requires licensed electricians with experience in transfer switches, load banking, grounding systems, and coordination with utility interconnection. Document your team's certifications (master electrician, NFPA 70E, etc.) and relevant project history.
Price for institutional complexity. Government estimates for electrical work in secure facilities often run higher than comparable commercial projects due to access logistics and specialized labor. Request a site visit if offered—this is critical for understanding staging areas, material delivery constraints, and working conditions.
Review past performance requirements. The Bureau of Prisons emphasizes reliability and safety record. Prepare references from similar electrical or generator installation contracts, especially any federal or correctional facility work.
Check for Davis-Bacon Act applicability. Construction work over $2,000 at federal sites requires payment of prevailing wages; ensure you can comply with certified payroll reporting.
Next steps
Read the full solicitation on SAM.gov using solicitation number 15BBNF27Q50100001. The notice was posted November 2, 2026, with responses due December 2, 2026, by 11:00 a.m. Pacific Time. Do not wait until the deadline—allow time for technical questions, subcontractor quotes, and final proposal assembly. Submit questions through SAM.gov as directed in the solicitation documents.